Case Study
The Oval Cricket Ground
Client
DMC Contracts (on behalf of The Oval Cricket Ground development team)
The Challenge
As part of an expansion project at The Oval Cricket Ground, four 30-metre lightning protection masts were to be installed.
The client required a specialist design to:
- Deliver proper lightning protection to the masts
- Achieve safe earth resistance readings
- Overcome site challenges, including extensive underground services (electrical cabling, pre-installed LP earthing, and pipework) which made conventional fall of potential testing unreliable.
Key Risks:
- Inability to test earthing systems using standard methods
- Inaccurate or unsafe earthing jeopardising mast and stadium safety
- Complications from existing below-ground infrastructure
Our Solution
We produced a comprehensive design using the site’s foundation reinforcement (rebar) as the primary earthing system.
Our approach involved:
- Calculating and confirming the resistivity of individual pile caps
- Verifying electrical continuity across the rebar within each pile cap
- Cross-bonding designated pile caps to the internal foundation steelwork
- Bonding the lightning masts directly to the tested rebar earth paths
Throughout the project:
- We tested and recorded continuity at each construction stage
- Formal documentation was issued for all tests and calculations
- Site visits were aligned with critical construction milestones to ensure real-time verification
The Result
We achieved full compliance and safe earthing of all four lightning protection masts despite underground obstructions.
We were able to:
- Track all buried services using specialist tracing methods
- Identify suitable locations for reliable earth measurement
- Confirm the resistivity through foundation rebar piles using calculation and continuity validation
The project was completed without disruption to the tight construction programme — and without the risk of non-compliant earthing at a major public venue.